EANS-News: Strabag consortium upgrading bridges along A9 motorway near Allersberg

Corporate news transmitted by euro adhoc with the aim of a Europe-wide distribution. The issuer is responsible for the content of this announcement.

Company Information

Cologne – A consortium consisting of STRABAG AG, subdivision Bavaria North, and Ed. Züblin AG, Subdivision Bridge Construction, will today begin with the upgrade of a total of eight bridges on the A9 motorway between the Nuremberg/ Feucht interchange and the Hilpoltstein junction on behalf of Autobahndirektion Nordbayern, the motorway authority for northern Bavaria. All bridges will be torn down and rebuilt.

The contract value of approx. EUR 38 million (net) also includes renovation works on the roads beneath three of the bridges as well as the demolition and new construction of a noise protection wall near Altenfelden. The contract also involves the construction of temporary ramps and roads to the construction sites and a provisional acceleration strip at the Allersberg junction.

Consortium leader STRABAG AG was awarded the contract for the construction project in September 2018. The work is to be performed from Monday through Saturday in a 24-hour operation if possible. Construction is divided into two phases: Work on the northward-bound lanes will take place from March to November 2019. After the winter break, construction will proceed on the southward-bound lanes from May to November 2020. The project is scheduled for overall completion by the end of 2020.

The bridge structures will involve the excavation of a total of approx. 74,000 t of excavated earth and the installation of approx. 21,000 t of asphalt. Due to the ground conditions, four of the bridges will be set on large bored piles with a diameter of 120 cm and the noise protection wall will be built on large bored piles with a diameter of 62 cm or 75 cm.

According to Autobahndirektion Nordbayern, the fundamental upgrading of the structures is unavoidable. Major parts of the bridges date back to the beginning of highway construction in Bavaria and were not designed for today’s heavy traffic. A simple increase of the load carrying capacity is technically and economically not feasible.

end of announcement euro adhoc

Attachments with Announcement:
———————————————-
http://resources.euroadhoc.com/documents/2246/5/10275923/1/20190311_PM_Brückenertüchtigung_A9_Allersberg_e.pdf

issuer: STRABAG SE
Donau-City-Straße 9
A-1220 Wien
phone: +43 1 22422 -0
FAX: +43 1 22422 – 1177
mail: investor.relations@strabag.com
WWW: www.strabag.com
ISIN: AT000000STR1, AT0000A05HY9
indexes: WBI, SATX, ATX
stockmarkets: Wien
language: English

Digital press kit: http://www.ots.at/pressemappe/4106/aom

STRABAG SE
Diana Neumüller-Klein
Head of Corporate Communications & Investor Relations
Tel: +43 1 22422-1116
diana.klein@strabag.com

OTS-ORIGINALTEXT PRESSEAUSSENDUNG UNTER AUSSCHLIESSLICHER INHALTLICHER VERANTWORTUNG DES AUSSENDERS. www.ots.at
© Copyright APA-OTS Originaltext-Service GmbH und der jeweilige Aussender